Systems East Inc. | Systems Controls

Client:

Chesapeake Bay Bridge and Tunnel District

Location:

Bridge Islands - Cape Charles, Virginia

Dates:

July 2020 to May 2022

Description of Work:

Prime electrical contract to remove (24) existing Steel Enclosed MCCs and replace with new SEI Custom Nema 4X 316 SS 480V Motor Control Panels each for control of 250 HP multi-speed ventilation fan motors. Each Panel includes a Schneider/Modicon PLC with an Operator Interface Terminal, fiber optic communications, and upgrades to the existing tunnel facility VT SCADA software.